Bag inspection checklist before shipment

An inspection does not tell you whether the bags are good. It tells you whether they match the standard you wrote down, in the cartons the inspector happened to open. That distinction decides most of the arguments that follow a container, so the checklist starts before the inspector arrives.

Published 24 November 2026 · Alice Bao, Harbour Bags

Short answer

Book the pre-shipment inspection when production is 100% complete and at least 80% of cartons are packed, and gate the 70% balance behind it. Use AQL 2.5 major / 4.0 minor / 0 critical against a spec sheet that states measurement tolerances, hardware codes and packing method. Then treat the four things buyers usually skip — carton drop, carton moisture, handle attachment and zip stop — as pass/fail items rather than notes.

StageWhat it catchesWhen it happens
In-line checkConstruction errors while they are still cheap to fixAt roughly 30–40% of production
Pre-shipment inspectionFinished goods against the written standard100% produced, 80% packed
Carton drop testCrushing that shows up as a creased flap after the voyageDuring the same visit
Loading supervisionCarton count and container sealAt the container, after sealing

The date is tied to the line, not to your calendar

Third-party inspection firms publish one number that matters: the goods must be 100 percent produced and at least 80 percent packed before the visit. A booking made against the vessel date instead of the production date is the single most common way a buyer wastes a visit fee. The inspector arrives, finds a line still running, measures part of a lot, writes a report with caveats, and the caveats are what you are left holding.

Work backwards instead. On a 35 to 50 day run the slot is three to five days before the carrier cut-off, and those days are the rework window, not slack. A lot that fails on Friday with the container loading on Monday is not a rework problem, it is an air freight problem.

If the order justifies two visits, put the first at 30 to 40 percent of production, while seams and hardware positions are still open to change. There, a wrong top-stitch distance costs a conversation; at final inspection it costs a re-cut.

AQL

What AQL 2.5 means in actual pieces

The defect class matters more than the number. Critical means a safety or legal failure — a sharp point on a child's bag, a small part that fits the test cylinder, a lead reading over the limit. That class is zero acceptance regardless of the AQL setting, and it is the one line in the report that should stop the shipment on its own.

Lot sizeCodeSampleMajor 2.5 (pass / fail)Minor 4.0 (pass / fail)
501–1,200J805 / 67 / 8
1,201–3,200K1257 / 810 / 11
3,201–10,000L20010 / 1114 / 15
10,001–35,000M31514 / 1521 / 22

One practical note. When a failed lot is sorted and offered again, the standard calls for tightened inspection: the same AQL one step down, which for 2.5 means 1.5. A promise to "sort it and re-present" therefore costs the factory more than doing the rework, and it is fair to say so when the report comes back.

Where the failures actually cluster

Defect counts are usually spread thin; the same four places repeat across styles. Writing tolerances for these into the spec sheet is what turns a subjective report into a pass/fail.

Measurements, taken after resting. A PU or soft leather bag measures differently the hour it is sewn and the day after. Cut panels stretch on the machine, then the material relaxes. Measure a sample the same day and you get a bag that is 4–6 mm wide; let it hang 24 hours and it comes back. The tolerance should be written as ±5 mm on body dimensions and ±3 mm on hardware spacing and strap drop, measured on a unit that has rested. Without the resting clause, a buyer and a factory can both be right and neither can prove it.

Handle and strap attachment. This is the first thing to break in use, and it is the last thing inspected. The stitch pattern at the tab should be a box with an X through it, and the tab should sit over a reinforcement, not directly on the shell. Pull it by hand with real force — the inspector's standard tug is roughly 10 seconds of steady load, not a flick. A tab that creeps at the stitch line will tear open in month three, when the buyer has no claim left.

Zip ends. The top stop sits 1–2 mm past the slider's rest position. Get it short and the slider walks off the track the first time someone pulls hard, which reads as a broken zip and returns the whole bag. Check the bottom stop too: a slider that over-travels at the base leaves the teeth misaligned on every close after that.

Colour, against the unit not the code. Two panels cut from different dye lots and sewn into one bag is a defect the buyer sees instantly and the factory genuinely cannot see, because both panels match the lab dip. Compare panels with each other in the same bag, then compare the bag with the approved sample under D65. On coated fabric, also check that the finish — matte, gloss, slight grain — is the same across panels, since a colour match with a different finish still reads as two bags.

Two components deserve their own line items. Hardware plating: salt spray at 24, 48 or 72 hours is a statement about coating thickness, and the sample that was approved at 48 hours will not improve because the bag is more expensive. Needles: for any product going to a household with children, ask for the needle detection record and the broken-needle log before the container is sealed. A factory that cannot produce either is not running the control, whatever the audit report says.

Sampling technique

Which cartons the inspector opens decides the result

Inspectors draw cartons at random from the lot — and the lot is whatever is staged on the floor. Cartons nearest the door, on top of the stack, are packed first and handled least; the units that cause trouble are at the back and bottom, under the stack's own weight.

Three habits are worth writing into the booking note:

  • Ask for cartons pulled from the bottom two tiers as well as the top. Cartons under load show crush damage that the top of the stack never will.
  • Open one carton completely, not five partly. The interior packing — polybag, divider, silica gel, desiccant quantity — is decided once per order and repeated for every carton, so one full unpack tells you more than five peeked-at ones.
  • Have the inspector photograph the carton marking. Shipping marks, carton number sequence and the side label are what a customs broker and a warehouse both work from, and a missing number is discovered at destination.

A factory staging its best cartons is behaving normally. The sample should represent the lot that ships, not the part of it that was convenient to reach.

Cartons: the part nobody photographs

Most inspection reports are full of bags and empty of boxes, which is backwards. The bag was already checked at the sample stage; the carton is the only thing that is new in every order.

Drop test. One carton, dropped from about 76 cm — the standard height for a parcel under roughly 9 kg — corner first, then an edge, then a face. Open it and look for what the drop did inside: a scuffed hardware corner, a flap that now sits with a crease, a zip that took the impact. Those marks are what a buyer sees on arrival, and the crease in the flap is set by the voyage, not by the drop, so a crease found now will be worse in six weeks.

Moisture. Carton board above roughly 12% moisture, plus 30 days in a container through a humid season, is a mildew colony. The lining goes first — PU and coated fabric trap moisture against the shell. Ask for the moisture reading and the desiccant quantity, and check that the polybag is vented rather than sealed airtight, since a sealed bag holds the humidity it was packed with.

Weight and dimension. A carton over about 20–22 kg stops being a one-person lift at the destination warehouse and starts being a handling complaint. Length plus girth over the carrier limit is a surcharge that appears after the invoice. Both are set by carton size, which is set by how the bags fold — at quotation, not at the packing table.

Compression. Racked four high, the bottom carton carries three cartons of load for months. A 5-ply K=K board is the ordinary export answer; a 3-ply carton that looks fine on packing day arrives with rounded corners. Tell the factory the stack height and let it size the board.

Failure

When the lot fails, the sequence matters more than the argument

ResultWhat it usually meansBest next move
PassLot matches the standard as sampledRelease balance, book loading supervision
Pass with observationsIssues outside the written standardDecide in writing before loading, not after
Fail, reworkableSorting and repair can fix it100% sort at factory cost, then tightened re-inspection
Fail, systematicMaterial, pattern or process is wrongStop. Rework will not fix a wrong pattern
Fail, criticalSafety or legal defectDo not load. No concession is worth it

The distinction that saves money is between a defect that sorting can fix and one that rework cannot. Loose threads, a missed bartack, a scuffed panel — those are sortable. A shell cut 8 mm narrow, hardware from a different plating batch, lining sewn with the wrong side out on every unit — those are systematic, and a 100% sort produces a stack of rejects rather than a shippable lot.

Three things to settle before the first inspection is booked, because settling them afterwards is a negotiation you will lose:

  1. Who pays for the sort. Write it as factory cost on a failed lot, not as a goodwill discussion.
  2. Who pays for the second visit. The buyer normally does; the point of writing it down is to make the factory's own failure cost them something.
  3. What happens to the vessel. If the booking cannot move, the honest comparison is rework plus air freight against shipping a discounted lot. Air freight on a few hundred kilos of bags usually costs more than the discount being offered, which is why the discount is offered.

One concession is legitimate: accepting a defined deviation, in writing, with the price adjusted and the deviation recorded against the style so the next order is judged against the same standard. What is not legitimate is accepting it verbally and discovering at the repeat that nobody remembers.

The payment gate, and the one visit after it

On T/T 30/70, the 70 percent balance is the last piece of leverage in the order, and it is spent the day it is paid. Whatever the inspection report says, once the balance has cleared the only remaining pressure is the relationship. So the gate is simple: report first, balance second, loading third.

Loading supervision is a separate visit and worth it on a full container. Somebody counts cartons as they go in, photographs the seal number, and signs a loading record. That record is what an insurance claim rests on when the count at destination does not match the packing list. Without it, the claim is a conversation between two parties who both believe their own paperwork.

On an LCL shipment the seal is not yours, so the substitute is a photo of the cartons and their numbers against the loading tally at handover.

Questions

Frequently asked

When should I book a pre-shipment inspection?

When production is 100 percent finished and at least 80 percent of the cartons are packed and sealed. Booked earlier, the inspector measures bags on a line rather than a finished lot, and the visit is wasted. On a 35 to 50 day run the practical slot is three to five days before the vessel cut-off, which leaves room to rework without moving the booking.

What AQL should I use for bags?

AQL 2.5 for major defects, 4.0 for minor, and zero acceptance for critical ones is the usual setting for bags and small leather goods. For a lot of 1,001 to 3,200 pieces that means a sample of 125: 7 major defects pass and 8 fail; 10 minor pass and 11 fail. Dropping to 1.5 on a repeat order that had problems last time is normal.

What does a passed inspection not cover?

It covers the pieces in the cartons the inspector drew, on the day of the visit, judged against the standard you wrote. It does not cover cartons packed after the visit, goods loaded later, or any property the spec sheet never defined. Where the standard is vague, the inspection passes vague goods and the argument arrives after the container does.

Who pays when a lot fails?

The second visit is normally paid by the buyer, and it is the smaller number. The larger one is air freight if the vessel sails without the goods, or the discount offered in place of rework. Agree before the first booking that a failed lot is sorted at the factory's cost, and that the re-inspection is at their cost too, and put both sentences in the purchase order.

Can the inspector judge colour?

Only against a physical approved sample, under a defined light. Colour is read under D65 in a light box rather than under the factory's fluorescent tubes, and the two panels of one bag should be compared with each other as well as with the standard. A Pantone number or a lab dip does not replace the approved unit, because it does not carry the finish.

Send a sketch or a unit you already sell. Get a drawing and a firm quote in 48 hours.

Every quotation we send lists the measurement tolerances and packing method the inspection will be read against.

Request a quote WhatsApp Email us

Related reading

WhatsApp